EasyManua.ls Logo

Camus Hydronics DRH5000 - Page 4

Camus Hydronics DRH5000
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.2 WARNING REGARDING CHILLED WATER AND HEATING COIL SYSTEMS .................................................. 17
4.3 INLET AND OUTLET CONNECTIONS ........................................................................................................ 18
4.4 MINIMUM PIPE SIZE REQUIREMENTS .................................................................................................... 18
4.5 HEAT EXCHANGER ................................................................................................................................. 18
4.6 LOW WATER TEMPERATURE SYSTEMS .................................................................................................. 18
4.7 INSTANTANEOUS WATER HEATER ......................................................................................................... 18
4.8 WATER FLOW SWITCH .......................................................................................................................... 19
4.9 LOW WATER CUTOFF (If Equipped) ...................................................................................................... 19
4.10 RELIEF VALVE ........................................................................................................................................ 19
4.11 CIRCULATING PUMP SELECTION ............................................................................................................ 19
4.11.1 CIRCULATING PUMP OPERATION OF HEAT EXCHANGER ........................................................................ 19
4.12 ∆T HEAT EXCHANGER ALGORITHM ........................................................................................................ 20
PART 5 ELECTRICAL & CONTROLS ...................................................................................................................... 20
5.1 ELECTRICAL CONECTIONS ...................................................................................................................... 20
5.2 VARIABLE FREQUENCY DRIVE (DR1200 – 5000) ..................................................................................... 21
5.3 DIFFRENTIAL AIR PRESSURE SWITCH ..................................................................................................... 21
5.4 BLOCKED FLUE SWITCH ......................................................................................................................... 21
5.5 DIFFERENTIAL GAS AND LOW GAS PRESSURE SWITCHES ....................................................................... 21
5.6 HIGH LIMIT ........................................................................................................................................... 21
5.7 DYNAFORCE® SOLA ............................................................................................................................... 22
5.7.1 SERVICE PARTS ...................................................................................................................................... 22
5.7.2 IGNITION MODULE LOCKOUT FUNCTIONS ............................................................................................. 22
5.8 DYNAFORCE® CONTROLLER ................................................................................................................... 22
5.9 ERROR TABLE ........................................................................................................................................ 22
PART 6 CONTROL PANEL ................................................................................................................................... 24
6.1 APPLIANCE TEMPERATURE CONTROLLER .............................................................................................. 24
6.2 CONFIGURE MENU ................................................................................................................................ 40
6.3 LEAD LAG SETUP UP TO 8 BOILERS ........................................................................................................ 42
6.4 LEAD LAG SETUP FOR UP TO 12 APPLIANCES ......................................................................................... 43
6.5 LOCAL/REMOTE SWITCH ....................................................................................................................... 43
6.6 COMM. PORT 2 ACTIVATION ................................................................................................................. 43
6.6 VARIABLE FREQUENCY DRIVE (DR1200 - 5000) ...................................................................................... 44
6.7 FROST PROTECTION .............................................................................................................................. 44
PART 7 COMPONENTS ...................................................................................................................................... 45
7.1 HOT SURFACE IGNITER (GLOW BAR) ...................................................................................................... 45
7.2 FLAME SENSOR ..................................................................................................................................... 45
7.3 COMBUSTION AIR FAN .......................................................................................................................... 45
7.4 INNER JACKET ....................................................................................................................................... 45
7.5 OUTER JACKET ..................................................................................................................................... 45
7.6 VENTING TRANSITION .......................................................................................................................... 45
PART 8 FIELD STARTUP PROCEDURE ................................................................................................................. 46
8.1 CHECKING THE INSTALLATION ............................................................................................................... 46
8.2 CHECKING THE CONSTRUCTION ............................................................................................................ 46
8.3 GAS VALVE ADJUSTMENT PROCEDURE .................................................................................................. 46
8.4 COMISSIONING APPLIANCE ................................................................................................................... 48
PART 9 TROUBLESHOOTING .............................................................................................................................. 49
PART 10 MAINTANANCE ..................................................................................................................................... 56
10.1 EXAMINE THE VENTING SYSTEM ........................................................................................................... 56
10.2 VISUALLY CHECK MAIN BURNER FLAMES .............................................................................................. 56
10.3 FLUE GAS PASSAGEWAYS CLEANING PROCEDURES ............................................................................... 56
10.4 CONDENSATION TREATMENT ............................................................................................................... 56

Table of Contents

Related product manuals