STARTING UP
After the plumbing and electrical connections, proceed to the starting up of the machine.
Turn on the tap from the water mains and switch the power ON/OFF by means of main switch.
The display will show for few seconds the software version
Re-filling the boiler.
This operation will automatically stop when the level of the probe is reached.
Heating the boiler.
PLEASE NOTE:
During this stage, keep the steam tap open for a few seconds, this operation will release the air from the boiler inside.