2
Moving and Storage To transfer unit from truck to
storage site, use a fork truck. Do not stack units more than
2 high during storage. If unit is to be stored for more than
2 weeks before installation, choose a level, dry storage site free
from vibration. Do not remove plastic wrap or skid from unit
until final installation.
Rigging All 40RM Series units can be rigged by using
the shipping skid. Units are shipped fully assembled. Do not
remove shipping skids or protective covering until unit is ready
for final placement; damage to bottom panels can result. Use
slings and spreader bars as applicable to lift unit.
INSTALLATION
General
Allow 2
1
/
2
ft at front and side of unit for service
clearance and airflow. For units equipped with an economizer,
refer to the accessory installation instructions for additional
clearance requirements. Be sure floor, wall, or ceiling can
support unit weight (Tables 1A-1F). See Fig. 1A-1C for
dimensions.
Uncrating Move unit as near as possible to final loca-
tion before removing shipping skid.
Remove metal banding, top skid, and plastic wrap. Examine
unit for shipping damage. If shipping damage is evident, file
claim with transportation agency. Remove base skid just prior
to actual installation.
Check nameplate information against available power
supply and model number description in Fig. 2.
NOTE: Be sure to remove the styrofoam shipping pad from
the thermostatic expansion valve (TXV). Verify that it has
been removed. See Fig. 3.
Accessories Refer to instructions shipped with each
accessory for specific information.