START-UP CHECKLIST FOR 30XV LIQUID CHILLERS
(Remove and use for Job File)
A. PROJECT INFORMATION
Job name _____________________________________
Address _____________________________________
City ______________________State ____Zip_________
Equipment tag/mark for____________________________
Installing contractor_______________________________
Sales office _____________________________________
Start-up performed by_____________________________
Design Information
Unit
Model ____________________________________ Serial________________________________________
Compressors
Compressor A
Model ____________________________________ Serial ________________________________________
Compressor B
Model ____________________________________ Serial________________________________________
Evaporator
Model ____________________________________ Serial ________________________________________
B. PRELIMINARY EQUIPMENT CHECK (This section to be completed by installing contractor)
1. Is there any physical damage? Ye s No
Will this prevent start-up? Ye s No
Description:
2. Unit is installed level as per the installation instructions. Ye s No
3. Power supply agrees with the unit nameplate. Ye s No
4. Correct control voltage ________vac. Ye s No
5. Electrical power wiring is installed properly. Yes No
6. Unit is properly grounded. Ye s No
7. Electrical circuit protection has been sized and installed properly. Yes No
8. All terminals are tight. Ye s No
9. All plug assemblies are tight. Ye s No
10. All cables, thermistors and transducers have been inspected for cross wires. Ye s No
11. All thermistors are fully inserted into wells. Ye s No
12. Oil separator heaters energized for 24 hours before start-up. Ye s No
13. Relief valve vent piping per local codes. Ye s No
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in preced-
ing sections of this Controls, Start-Up, Operation, Service and
Troubleshooting document.
CAPACITY EWT LWT FLUID TYPE FLOW RATE P.D. AMBIENT
Evaporator