Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53300196-01 Printed in U.S.A. Form 30XV-3T Pg 350 6-19 Replaces: 30XV-2T
 Carrier Corporation 2019
INDEX
Abbreviations, 3
Actual Start-Up, 49
Actuated ball valve (ABV), 55
Alarms and alerts, 208
Alarm Control, 46
Alarm history, 208
Communication failure retry, 47
Current alarms, 208
Equipment priority, 47
Re-alarm time, 47
Resetting alarms, 208
Routing control, 46
System name, 47
VFD alarms and alerts, 220
Alarms menu table, 21
appendix b end, 307
BACnet points table, 309
Black box function, 223
Board addresses, 19
Broadcast configuration, 46
Acknowledger, 46
Activate, 46
OAT broadcast, 46
Capacity control overrides, 47
Carrier Comfort Network
®
(CCN), 19
Interface, 19
Loadshed controlled demand
limit, 45
Tables, 281 – 307
Chilled water flow switch, evaporator, 73
Chilled water fluid type selection, 30
Chilled water set point configuration, 27
Circuit/compressor staging and
loading, 32
Communication failure retry time, 47
Component drawings, 4
Compressor, 67
Assembly, 67
Compressor drives, 81
Oil system, 68
Protection, 75
Condenser coil maintenance and cleaning
recommendations, 74
MCHX, 74
RTPF, 74
Condenser fan drives, 81
Condenser fans, 75
Configuration (software), 20 – 49
Configuration menu table, 22
Control and power drawings reference
table, 22
Control module communication, 19
Controls, 4 – 20
Conventions used in this manual, 3
Cooling set point selection, 27
Daylight saving time configuration, 47
Demand limit, 44
CCN loadshed controlled, 45
Externally powered current
based, 45
Switch controlled, 44
Demand limit active, 56
DIP switch addresses
Auxiliary (AUX) boards, 17
Input/output (SIOB) boards, 15
Dual chiller control, 33
For parallel applications, 33, 34
For series applications, 35, 37
Pump control for parallel chiller
applications, 35
Pump control for series chiller
applications, 38
Dual chiller sequence of operation, 55
Economizer assembly, 64
Electrical schematics, 226
Electronic expansion valve (EXV), 64
Economizer EXV control, 65
Main EXV control, 64
Troubleshooting procedure, 65
Emergency on/off switch (SW2), 18
Enable-off-remote contact switch
(SW1), 18
Energy Management Module (EMM), 18
Evaporator
Protection, 71
Pump control, 31
Retubing, 72
Service, 68
Evaporator heater sensor set point, 332
Evaporator pump rotation, 56
Flow rate requirements, 50
Fluid set point control location, 27
Fluid type selection, 30
Freeze protection, 71
Green LED, 19
Head pressure control, 48
Heat exchangers, inspecting/cleaning, 72
Ice mode in effect, 56
Ice storage operation, 46
Isolation valve, 68
Leak testing, 75
Local equipment network, 19
LON point table, 308
Loss of fluid flow protection, 71
Low ambient temperature, 50
Operating instructions, 50
Low fluid temperature, 71
Machine control methods, 25
Machine on/off function, 26
Fast loading, 45
Machine start delay, 45
Main menu table, 21
Maintenance, 208
Log Sheets, 330, 331
Recommended schedule, 208
Maintenance menu table, 23, 24
Master slave control active, 56
Microchannel heat exchanger maintenance
and cleaning, 74
Minimum fluid loop volume, 50
OAT broadcast, 46
Oil recovery, 57
Oil separator heaters, 76
Operating limitations, 50
Operating modes, 56
Operating type selection, 26
Operation, 55 – 64
Outside air temperature reset, 41
Piping and instrumentation, 328, 329
Pressure relief valves, 76
Pre-start-up, 49
Pump operation, 56
Pump periodic start, 56
Pump selection, 31
Quick test, 226
Ramp loading, 38
Re-alarm time, 47
Recommended maintenance
schedule, 208
Red LED, 19
Refrigerant charge, 75
Refrigerant circuit, 75
Relief devices, 76
Remote alarm and alert relays, 20
Reset in effect, 56
Retubing, 72
Evaporator, 72
Return water reset, 42
Round tube plate fin condenser coil
maintenance and cleaning, 74
Safety considerations, 2
Safety devices, 75
Second setpoint in use, 56
Sensors, 57
Sequence of operation, 55
Service, 64 – 207
Service test, 226
Set point occupancy, 28
Space temperature reset, 43
Standard I/O board, 15 – 16
Start-up, 49 – 54
Start-up checklist for 30XV liquid
chillers, CL-1 – CL-8
Start-up delay in effect, 56
Status messages, 8
System check, 49
Temperature reset, 38, 43
Thermistors, 57
Tightening evaporator head bolts, 72
Touch Pilot display, 5
Configuration tables, 20
Controls, 4
Display tables, 249 – 280
Home screen, 5
Interface parameters, 333 – 335, 336
Login and display setup, 9
Main menu screen, 9
Menu architecture, 11
Time and date, setting, 11
Trendings, 11
User interface, 5
Web interface, 333 – 335
Welcome screen, 5
Transducers, 57
Troubleshooting, 208 – 248
Tube plugging, 71
Unit sizes, 3
Variable frequency drives (VFDs), 76
Alarm reset, 206
Compressor drives, 81
Condenser fan drives, 81
Configuration tables, 93
Display navigation, 91
Long term storage, 207
Replacement procedure, 206
Status, 93
Victaulic coupling installation, 67
Voltage limits, 50
Water treatment, 73
Winter shutdown, preparation for, 73
Wiring, 227 – 246