6
NOTE
5. Adjust the length of two plastic bolts base on the length of through out from standard
electric cabinet to the wall. Conrm the two bolts xing in the cabinet are in the same
length and vertical to the wall surface.
6. Fix the bottom cover to the electric cabinet by the accessory slotted head screws.
Conrm the bottom cover is parallel to wall surface.And then reinstall the bottom
cover to centralized controller. (See g 3-4)
Over tighten the screw would cause rear cover deformed and LCD damage.
When installation, please maintain the screws and wire controller at the same height
level without deformed.
When installation, please reserve a certain length of wire controller connective cable
for future maintenance to take o the wire controller.
3. INSTALLATION METHOD