EasyManua.ls Logo

Carrier TC-PHP - Modifying Time Periods

Carrier TC-PHP
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
Checklist
1. Run equipment through several heating and cooling cycles to ensure proper
operation. To operate the thermostat in its normal operating mode, consult
the Owners Manual.
2. If the equipment is to be left in operation, the setpoints, operating mode,
and possibly p rogram schedule must be properly selected.
3. Put away tools and instruments and clean up debris.
4. Review and leave Owner’s Guide with owner.

Other manuals for Carrier TC-PHP

Related product manuals