- 4 -
INSTALLATION & CONNECTION
Installation
INDICATOR
LEVELING GAUGE
How to install the BW-series
1. Open the box with care because indicator is
connected to the scale with load cell wire.
2. Turn the post knob so as to fix indicator.
3. Pull down the wire out of post pipe and insert
the post pipe to the post bracket. (Refer to fig. 1)
4. Fasten the post pipe with two bolts. (Refer to fig. 1)
A long bolt should be connected to the upper side.
5. Insert the wire to the post pipe. (Refer to fig. 2.3)
6. If the scale is not properly level, please adjust
4 leg(adjusting bolt) at the bottom of the scale
so as to center the bubble of the leveling gauge
Note: Place the scale on a flat and stable surface.
inside the indicated circle.
FIG. 3
ADJUST
FIG. 2
WIRE
FIG. 1
POST BRACKET
PLATFORM
POST KNOB
POST PIPE
POST BRACKET
LOAD CELL WIRE
BOLT
POST PIPE