EasyManua.ls Logo

Case IH AXIAL-FLOW 2577 - Page 169

Case IH AXIAL-FLOW 2577
479 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 - FIELD OPERATION
155
M. Distribution Heavy on Right Side
1. Add Filler to Right of First Concave
2. Add, Remove or Adjust Auger Bed Paddle
3. Decrease Rotor Speed
4. Close Concave
5. Decrease Forward Travel Speed
N. Distribution Heavy on Left Side
1. Remove Fillers from Right of First Concave
(if installed)
2. Open Concave
3. Decrease Rotor Speed
4. Increase Rotor Speed
5. Add, Remove or Adjust Auger Bed Paddle
6. Remove Some Wires from Concaves
7. Decrease Forward Travel Speed
8. Inspect Concave for “zero” at 12th Bar of the
Concave

Related product manuals