CONTROLLER
3 - 8
CX EXCAVATORS
CONTROLLER CALIBRATION PROCEDURE
CX130 / CX160
7. After inputting all machine information, start the engine and push the
Cushion switch. The engine will go to full RPM then slowly lower to idle.
Note: Coolant temperature must be above
122°F.
The process is finished when the engine RPM can be controlled by the
throttle control again.
8. Press the Auto mode switch to finish and return to normal display.
MACHINE: SH0200 –3
TERRITORY: 2 LANGUAGE: 1
CONT. P/N KHR XXXX