EasyManua.ls Logo

Cassese CS 79 - Putting Into Operation; Unpacking and Reassembly

Cassese CS 79
14 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CLOSING CLIPS
OPENING CLIPS
S1 S2
AX
Fig E
AX
M
EA
Fig D
PUTTING INTO OPERATION
CP
3
Fig H
Fig F
Fig G
BOTTOM
PULLEY
M
1 ) UNPACKING & REASSEMBLY
Ta
Fig B
fig.A
B
Fig C
Po
P
BP
BF
- Keep the package of the machine so, that the arrows drawn on the outside stand up, (see Fig A)
- Open the parcel. Remove machine’s table Ta and the foam protection (see Fig. B).
- (See Fig C) Pressing down the crossing wood piece B, loosen and remove one of the two feet of
the machine that are holding the wood piece B in place. The wood piece B is pushed up by the
machine’s top presser; therefore remove it slowly until the machine’s top presser is completely
free. Fix the removed foot back on machine.
- Remove the foot pedal P and the accessory box now. (See detail of content page 5)
- Remove the turning upper cabinet BP and the bottom cabinet BF. (Fig.C)
- The bottom cabinet BF is upside down; put it right on its feet.
- Place the upper cabinet BP on the bottom cabinet BF.
- Close the locking clips as shown on Fig.D.

Related product manuals