EasyManua.ls Logo

Cellofoam PERMAPORT XPRESS - Page 13

Default Icon
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 13 -
Position the forward most dock Bracket so the center of the
tube lines up with the line drawn on the dock, ensure that
the bracket is firmly against the stringer, and attach to the
dock using screws or bolts in the top two holes, (Note: If
necessary, chamfer the top front edge of the dock).
Repeat for the other dock Bracket, float the
Xpress
up to the dock, and ensure that the
Xpress
brackets line up with the dock brackets
by sliding a piece of the 2” schedule 40 pipe in
the dock brackets and into the
Xpress
brackets. If everything lines up, insert the
remainder of the bolts in the front of the
Brackets