EasyManua.ls Logo

CFMoto CF500 - 5. Engine Removal and Installation; Engine Removal Preparations and Steps

Default Icon
254 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Removal and Installation of Engine, Drive Train and Gearshift Unit
Overhaul Info…..……………………………..5-1
Engine Removal and Installation…………...5-2
Removal and Installation of Front and Rear
Axle……………………………………………….5-5
Removal and Installation of Gearshift Unit……5-7
Overhaul info
Operation cautions
Securely support the ATV with bracket when removing or installing engine.
Take care not to damage frame, engine body, bolts and cables.
Wrap the frame to avoid any possible damage when removing or installing the engine.
Following operation doesn’t require removal of engine from the vehicle:
Oil pump
Carburetor, air filter
Cylinder head cover, cylinder head, cylinder body, camshaft
CVT system, CVT cover
Gearbox
Right side cover, AC magneto, water pump
Piston, piston ring, piston pin
Following operation require removal of engine from vehicle:
Crankshaft
Tightening torque:
Engine front upper mounting bolt: 35N45N·m
Engine front rear mounting bolt: 4050N·m
Bolt, engine front rear mounting bracket 3545N·m
Bolt, engine front upper mounting bracket 3545N·m
5-1

Related product manuals