Notes on operation
. Follow all applicable instructions in this manual when opera
.
During the break-in phase, which takes about 8 hours, the s
at high speeds without load (better do not pull the throttle
throttle.). Following this procedure will lengthen the service li
. After the saw works for a certain period of time, let the engine idle on for a while to
5.
ting the cut-off saw.
aw must not be operated
trigger beyond 3/4 of full
fe of your machine.
dissipate the heat. This will prevent some engine parts (ignition system, carburetor etc.)
ver heating.
0C cut-off saw
31
from being damaged by o
Ad ustment of EHS35
j
1. Adjusting V-belt tension
Refer to the instruction described above in the section titled “Tensioning the V-belt”.