2-2 Installation
3930 Service Delivery Switch Hardware Installation and Start-up Manual
009-3223-001 Standard Revision E
Copyright
©
2012-2014 Ciena
®
Corporation January 2014
If the unit is damaged or if any of the above items are missing, please contact
your sales representative.
Note: Mounting brackets for Wallmount, and 23-inch racks are also
available. If they are required for your installation, you need to order these
brackets separately.
You will also need to order:
Power supplies (up to 2 AC or 2 DC power supplies)
Power cables
Grounding lug and grounding wire
Alarm cable
SFP/SFP+ modules for the 1/10 Gigabit Ethernet ports (up to 2 ports)
SFP modules for the 100/1000 Mbps ports (up to 8 ports)
Faceplate cabling (Cat-5 STP and optical cabling to match the SFP and
SFP+ connector types used)
SYNC cable — BITS cable available in 100 or 120 Ohm
1 PPS cable
10 MHz cable
Note: Ciena offers a coax to SMB cable for connection to the 1 PPS and
10 MHz ports. The same cable can be used for both ports.
Required Tools and Supplies
For rack mount installations you will also require the following tools:
Flat head screwdriver
Phillips #2 screwdriver
Digital Volt Ohm Meter
rack screws (4 per device)
cable ties / cord retainers — to secure ground, power and interface cabling
Wire-strippers (for DC power cable)
Fork terminal spade lugs (3 per DC power supply) — to install power
cabling to a DC system
Power wire (14 AWG) — to install power cabling to a DC system
Note:
Table 2-1 on page 2-9 provides a summary of the DC lugs that are
recommended for use with the 3930.