vii
3930 Service Delivery Switch Hardware Installation and Start-up Manual
009-3223-001 Standard Revision E
Copyright
©
2012-2014 Ciena
®
Corporation January 2014
Contents 0
About this Document xi
Overview 1-1
Installation 2-1
Package Contents 2-1
Required Tools and Supplies 2-2
Important Safety Information 2-3
Mounting the Device 2-4
Wall Mount Installation 2-4
Frame Installation 2-4
Grounding 2-5
Power Supply Grounding 2-5
Supplemental Ground 2-5
Power Supply Modules 2-6
Simplex Power 2-6
Redundant Power 2-7
Dressing the Power Cord 2-7
AC Power Supplies 2-7
DC Power Supplies 2-8
Transceivers 2-9
Cable Installation and Guidelines 2-10
Connecting Cables to the 3930 2-11
Alarm Cable 2-12
Synchronization Cable 2-13
GPS/1PPS/TOD Cable 2-14
Fiber Optic Cables 2-14
Ethernet Cables 2-15
Initial Configuration 2-15
2-1 To Install 3930 on a Wall 2-16
2-2 To Install 3930 in a Frame 2-17
2-3 Installing Supplemental Ground 2-18
2-4 Installing an AC Power Supply 2-19
2-5 Installing a DC Power Supply 2-21
2-6 Installing an Alarm Cable (Optional) 2-24
2-7 Installing a Sync Cable (Optional) 2-25
2-8 To Install a Pluggable Optic 2-26
2-9 To Remove a Pluggable Optic 2-27