□ Cell Unions installed and glued into pipe work.
□ Threaded Collars on either side of the Cell are hand tight.
□ Flow Switch is installed and oriented properly.
□ Control Module is affixed to wall and wired correctly.
□ Cell Cable and Flow Switch are connected to Control Module.
You have checked and confirmed that Control Module switches ON and
OFF concurrently with filter pump, or is energized continuously for use
with variable speed pump.
□ You have checked all connections and joints for leaks.
Sufficient salt has been added and fully dissolved and circulated
throughout pool water.
□ Pool has properly balanced water chemistry.
INSTALLATION CHECKLIST