Do you have a question about the Cisco Catalyst IE 3 00 Series and is the answer not in the manual?
Software | Cisco IOS |
---|---|
Product Type | Switch |
Layer | Layer 2 |
Operating Temperature | -40°C to 75°C (-40°F to 167°F) |
Mounting | DIN Rail |
Redundancy | Dual DC power inputs |
Power Supply | Internal |
Covers initial preparation, environmental guidelines, and critical safety warnings for switch installation.
Specifies environmental requirements and minimum clearances for proper switch operation.
Provides general instructions and considerations for installing the switch.
Step-by-step guide for installing and removing the optional flash memory card.
Instructions on establishing a console connection to the switch for management.
Procedures for physically attaching optional expansion modules to the switch.
Lists necessary tools, equipment, and detailed procedures for grounding the switch.
Information on compatible power supply options and their capabilities.
Detailed steps for connecting both AC and DC power sources to the switch.
Final steps to apply power to the switch after all connections are made.
Step-by-step guide for physically mounting the switch, including DIN rail installation.
Instructions on how to safely remove the switch from its DIN rail mounting.
Procedures for wiring external alarm devices to the switch.
Steps to attach the alarm connector to the switch front panel.
Instructions for connecting network devices to the switch's Ethernet ports.
Procedures for installing SFP modules into the switch's SFP module ports.
Guidance on connecting fiber-optic cables to the installed SFP modules.
Procedures to verify that the switch powers up and operates correctly after installation.
Guidance on post-installation configuration and management options for the switch.