Do you have a question about the Cisco Nexus 93240YC-FX2 and is the answer not in the manual?
Device Type | Switch |
---|---|
Product Series | Nexus 9000 |
Forwarding Rate | 3.6 bpps |
Jumbo Frame Support | Yes |
Jumbo Frame Size | 9216 bytes |
Operating System | Cisco NX-OS |
Memory | 16 GB |
Model | Nexus 93240YC-FX2 |
Dimensions | 1.72 inch x 17.3 inch x 22.5 inch |
Operating Temperature | 32 to 104 °F (0 to 40 °C) |
Routing Protocol | BGP, OSPF, EIGRP, RIP, PIM, HSRP, VRRP |
Remote Management Protocol | SNMP, RMON, CLI |
Compliant Standards | IEEE 802.1D, IEEE 802.1p, IEEE 802.1Q, IEEE 802.1s, IEEE 802.1w, IEEE 802.3ad, IEEE 802.3ae, IEEE 802.3x |
Overview, conventions, and related documentation for the manual.
Information on providing feedback and accessing Cisco services.
General introduction to the Cisco Nexus 93240YC-FX2 switch.
Specifies acceptable temperature, humidity, and altitude for the switch.
Covers dust, interference, shock, vibration, and grounding requirements.
Details power supply options and airflow direction for cooling.
Lists suitable rack types and necessary physical clearance.
Key safety precautions and general installation guidelines.
Detailed instructions for installing using rack-mount kits.
Procedures for grounding the chassis and installing airflow sleeve.
Steps for powering on and starting the switch after installation.
Introduces network connections and console setup.
Guides through initial setup and management port configuration.
Details connecting uplink and downlink ports to other devices.
Procedures for replacing fan and power supply modules.
Steps for replacing a DC power supply module.
Describes suitable rack types and general installation requirements.
Lists environmental parameters, dimensions, and module weights.
Lists power consumption and detailed power supply specs.
Details power cables and regulatory compliance standards.
Explains status and color of switch, fan, and power supply LEDs.
Lists contents of rack mount kits and airflow sleeve.
Checklist for tasks required before installing the switch.
Worksheets for recording site and module details.