Do you have a question about the Cisco Nexus 9348GC-FXP and is the answer not in the manual?
Identifies the intended audience and explains documentation conventions used in the manual.
Lists additional Cisco documentation and provides feedback channels.
Details the 1RU fixed-port switch for ACI deployments and its components.
Illustrates and labels the front and power supply side hardware features of the switch.
Covers temperature, humidity, and altitude limits for switch operation and safety.
Essential steps for safe chassis grounding and adequate power provisioning.
Guidelines on airflow direction, module coloring, and rack/cabinet compatibility.
Crucial safety instructions and general guidelines for switch installation.
Step-by-step instructions for installing the switch using specific rack-mount kits.
Procedures for chassis grounding and initial power-up verification.
Procedures for removing and installing fan modules in the switch.
Guidance on replacing AC and DC power supply modules for redundancy.
Detailed steps for correctly wiring the DC input power source to the switch.
Explains the architecture and connection requirements of the ACI fabric.
Steps for connecting leaf switches to APICs and spine switches within the ACI fabric.
Instructions for optionally setting up console and management network connections.
Specifies compatible rack types, dimensions, and clearances for installation.
Details environmental conditions, physical dimensions, and weights of the switch and modules.
Covers power input, transceiver support, and regulatory compliance standards.
Explains the status and meaning of LEDs on the switch chassis, fan modules, and power supplies.
Lists the components included in various rack mount kits for the Cisco Nexus switch.
A checklist to ensure proper site planning and preparation for switch installation.
Worksheets to record site contact details and switch/module information.