Cisco Nexus 9364C-GX ACI-Mode Switch Hardware Installation Guide
First Published: 2019-12-20
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Cisco Nexus 9364C-GX and is the answer not in the manual?

Cisco Nexus 9364C-GX Specifications

General IconGeneral
BrandCisco
ModelNexus 9364C-GX
CategorySwitch
LanguageEnglish

Summary

Chapter 2 Preparing the Site

Temperature Requirements

Specifies the acceptable ambient operating and non-operating temperature ranges for the switch.

Minimizing Electromagnetic and Radio Frequency Interference

Provides guidelines to reduce EMI/RFI affecting other devices and the switch itself.

Grounding Requirements

Explains the importance of earth-ground connection for the switch to protect against voltage variations.

Planning for Power Requirements

Details the switch's power supply configuration and redundancy options.

Airflow Requirements

Describes port-side intake and exhaust airflow, and how to position the switch accordingly.

Clearance Requirements

Specifies the necessary physical clearances around the chassis for installation, cabling, and airflow.

Chapter 3 Installing the Chassis

Installation Options with Rack-Mount Kits, Racks, and Cabinets

Explains how to install the switch using rack-mount kits and the types of racks supported.

Installing the Switch using the N9K-C9300-RMK Rack-mount Kit

Provides detailed steps for attaching bottom-support rails to the rack for mounting.

Attaching Front-Mount Brackets to the Chassis

Explains how to attach right-angled front-mount brackets to the chassis sides for rack mounting.

Installing the Chassis in a Four-Post Rack

Details the process of sliding the chassis onto the installed bottom-support rails in a four-post rack.

Grounding the Chassis

Explains how to properly ground the switch chassis for safety and data integrity.

Starting the Switch

Guides on powering up the switch after installation and grounding.

Chapter 4 Connecting the Switch to the ACI Fabric

Connecting Leaf Switches to APICs

Details how to connect Cisco Nexus 9300 leaf switches to APICs using compatible interface cards.

Connecting Leaf Switches to Spine Switches

Explains how to connect leaf switches to spine switches for optimal forwarding in an ACI fabric.

Chapter 5 Replacing Components

Replacing a Power Supply Module

Details how to replace power supply modules, emphasizing matching airflow and power source types.

Removing an AC Power Supply

Provides step-by-step instructions for safely disconnecting and removing an AC power supply module.

Installing an AC Power Supply

Guides on installing a replacement AC power supply, ensuring proper alignment and connection.

Wiring a 48 V DC Electrical Connector Block

Details how to connect ground, negative, and positive DC power cables to a connector block.

Appendix C LEDs

Appendix D Additional Kits

Related product manuals