EasyManua.ls Logo

Cisco Nexus 9516 - Installing the Bottom-Support Rails

Cisco Nexus 9516
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
For six modules, they are in slots FM 1, FM 2, FM 3, FM 4, FM 5, and FM 6.
Fabric slots FM 2, FM 4, or FM 6 must be filled with functioning fabric modules or blank modules with power
connectors (N9K-C9516-FM-Z) in order to provide power to the fan trays covering those modules.
If fabric slots FM 1, FM 3, or FM 5 are not filled with a fabric module, you must make sure that they have a
blank module (N9K-C9516-FM-CV) installed to preserve the designed airflow.
Note
Fan trays (3) (N9K-C9516-FAN)
Power supplies (1 to 10)
3-kW AC power supply (N9K-PAC-3000W-B)
3-kW Universal AC/DC power supply (N9K-PUV-3000W-B)
3.15-kW Dual Input Universal AC/DC power supply (N9K-PUV2-3000W-B)
3-kW DC power supply (N9K-PDC-3000W-B)
Rack Mount kit
Rack mount kit for the Cisco Nexus 9516 (N9K-C9500-RMK) chassis
Bottom-support rails (2)
M6 mounting screws (20)
10-32 mounting screws (20)
12-24 mounting screws (20)
Switch accessory kit (N9K-ACC-KIT)
Step 2 Check the contents of each box for damage.
Step 3 If you notice any discrepancies or damage, send the following information to your customer service representative by
email:
Invoice number of the shipper, see the packing slip.
Model and serial number of the missing or damaged unit
Description of the problem and how it affects the installation.
Photos of the damage to external packaging, internal packaging, and product
Installing the Bottom-Support Rails
The bottom-support rails support the weight of the switch chassis in the rack or cabinet. To maximize the
stability of the rack, you must attach these rails at the lowest possible rack unit (RU).
Cisco Nexus 9516 NX-OS Mode Switch Hardware Installation Guide
19
Installing a Chassis
Installing the Bottom-Support Rails

Table of Contents

Related product manuals