1-21
Cisco ONS 15454 DWDM Procedure Guide, R8.0
78-17704-02
Chapter 1 Install the Shelf and Common Control Cards
NTP- G3 Open and Remove the Front Door
Figure 1-8 Positioning the Mounting Brackets for Deep Door Configuration
Step 11
Repeat for the other side of the assembly.
NTP-G3 Open and Remove the Front Door
Step 1 Complete the “DLP-G9 Open the Front Cabinet Compartment (Door)” task on page 1-22.
Step 2 Complete the “DLP-G10 Remove the Front Door” task on page 1-23.
Step 3 If you are using an ETSI shelf, continue with the “NTP-G4 Open and Remove the FMEC Cover (ETSI
Only)” procedure on page 1-25. If you are using an ANSI shelf, continue with the “NTP-G5 Remove the
Backplane Covers (ANSI Only)” procedure on page 1-28.
Purpose This procedure opens and removes the front door to access the equipment.
Tools/Equipment Open-end wrench
Pinned hex (Allen) key
Prerequisite Procedures NTP-G2 Install the Shelf Assembly, page 1-8
Required/As Needed Required
Onsite/Remote Onsite
Security Level None
240850
80 mm 80 mm
Side View
Front
Front