CHAPTER
1-1
Cisco ONS 15454 DWDM Procedure Guide, R8.0
78-17704-02
1
Install the Shelf and Common Control Cards
This chapter explains how to install the Cisco ONS 15454 ETSI and Cisco ONS 15454 ANSI shelf
assemblies. Where procedures differ for the two shelf types, the procedure will indicate “ANSI only” or
“ETSI only.” For a summary of the tools and equipment required for installation, see the “Required Tools
and Equipment (ETSI)” section on page 1-5 or the “Required Tools and Equipment (ANSI)” section on
page 1-3.
Note Unless otherwise specified, “ONS 15454” refers to both ANSI and ETSI shelf assemblies.
Before You Begin
This section lists the chapter procedures (NTPs). Turn to a procedure for applicable tasks (DLPs). Read
the installation procedures and precautions before you install the ONS 15454 ANSI or ONS 15454 ETSI
and connect the power source.
1. NTP-G1 Unpack and Inspect the Shelf Assembly, page 1-6—Complete this procedure before
continuing with the “NTP-G2 Install the Shelf Assembly” procedure on page 1-8.
2. NTP-G2 Install the Shelf Assembly, page 1-8—Complete this procedure to install the shelf
assembly in a rack.
3. NTP-G3 Open and Remove the Front Door, page 1-21—Complete this procedure to access the
equipment before continuing with other procedures in this chapter.
4. NTP-G4 Open and Remove the FMEC Cover (ETSI Only), page 1-25—Complete this procedure to
access the electrical facility connection assembly (EFCA) for the front mount electrical connections
(FMECs) before continuing with other procedures in this chapter.
5. NTP-G5 Remove the Backplane Covers (ANSI Only), page 1-28—Complete this procedure to
access the backplane before continuing with other procedures.
6. NTP-G6 Install the MIC-A/P and MIC-T/C/P FMECs (ETSI Only), page 1-30—Complete this
procedure to install the MIC-A/P and MIC-T/C/P FMECs, which are required for power supply as
well as alarm, timing, and LAN connections.
7. NTP-G7 Install the Power and Ground, page 1-32—Complete this procedure before continuing with
the “NTP-G8 Install the Fan-Tray Assembly” procedure on page 1-42.
8. NTP-G8 Install the Fan-Tray Assembly, page 1-42—Complete this procedure to install the fan-tray
assembly in the shelf.
Question and Answer IconNeed help?

Do you have a question about the Cisco ONS 15454 ETSI and is the answer not in the manual?

Cisco ONS 15454 ETSI Specifications

General IconGeneral
BrandCisco
ModelONS 15454 ETSI
CategoryServer
LanguageEnglish

Summary

Install the Shelf and Common Control Cards

Before You Begin

Lists chapter procedures (NTPs) and tasks (DLPs) before installation.

Required Tools and Equipment (ANSI)

Required Tools and Equipment (ETSI)

Unpack and Inspect the Shelf Assembly

Install the Shelf Assembly

Open and Remove the Front Door

Open and Remove the FMEC Cover (ETSI Only)

Remove the Backplane Covers (ANSI Only)

Install the MIC-A/P and MIC-T/C/P FMECs (ETSI Only)

Install the Power and Ground

Install the Fan-Tray Assembly

Install the Alarm Expansion Panel (ANSI Only)

Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections

Install Alarm Wires on the MIC-A/P (ETSI Only)

Installs alarm cables on the MIC-A/P for external alarms and controls.

Install Timing Wires on the MIC-C/T/P (ETSI Only)

Install LAN Wires on the MIC-C/T/P (ETSI Only)

Install Alarm Wires on the Backplane (ANSI Only)

Install Timing Wires on the Backplane (ANSI Only)

Install LAN Wires on the Backplane (ANSI Only)

Install the TL1 Craft Interface Wires (ANSI Only)

Install an External Wire-Wrap Panel on the AEP (ANSI Only)

Install and Close the FMEC Cover (ETSI Only)

Install the Rear Cover (ANSI Only)

Install DWDM Equipment

Install the DCU Shelf Assembly

Installs the Dispersion Compensation Unit (DCU) chassis.

Install the Fiber Patch-Panel Tray

Installs the fiber patch-panel tray.

Install the Fiber-Storage Tray

Installs the fiber-storage tray.

Install the Ethernet Adapter Panel

Install the Y-Cable Module Tray

Install the FlexLayer Modules

Install the Y-Cable Protection Modules in the FlexLayer Shelf

Install the Y-Cable Protection Modules in the Y-Cable Module Tray

Install the Common Control Cards

Install the TCC2 or TCC2P Card

Installs redundant TCC2/TCC2P cards, initializing the shelf.

Install the AIC-I Card

Installs the AIC-I card for external alarms and controls.

Install the MS-ISC-100T Card

Installs redundant MS-ISC-100T cards for multishelf node configuration.

Connect a Multishelf Node and Subtending Shelves to an MS-ISC-100T Card

Connect a Multishelf Node and Subtending Shelves to a Catalyst 2950

Configure a Cisco Catalyst 2950 for a Multishelf Node

Uses Cisco IOS to configure the Cisco Catalyst 2950 for multishelf node.

Perform the Shelf Installation Acceptance Test

Inspect the Shelf Installation and Connections

Measure Voltage

Related product manuals