EasyManua.ls Logo

Cisco WS-SUP720-3B - Supervisor Engine 720

Cisco WS-SUP720-3B - Supervisor Engine 720
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER
3-1
Cisco 7600 Series Router Supervisor Engine and Route Switch Processor Guide
OL-10100-11
3
Installing and Configuring Route Switch
Processors and Supervisor Engines
This chapter describes how to install and configure a route switch processor or supervisor engine. It also
provides instructions for connecting to the console and uplink ports on the module.
This chapter contains the following sections:
Preparing for Installation or Removal, page 3-1
Determining Module Location, page 3-3
Installing a Supervisor Engine or Route Switch Processor, page 3-4
Removing a Supervisor Engine or Route Switch Processor, page 3-7
Hot Swapping (OIR) Modules, page 3-8
Connecting to the Console Port, page 3-9
Connecting to the Uplink Ports, page 3-10
Using Flash Memory Cards, page 3-12
Power Management and Environmental Monitoring, page 3-14
Determining Software Feature Support, page 3-14
Upgrading DIMMs on RSP720, page 3-14
Configuring a Supervisor Engine or Route Switch Processor, page 3-17
Preparing for Installation or Removal
Before you attempt to install a supervisor engine or route switch processor in the router, be sure to:
Review the safety precautions and electrostatic discharge guidelines in the Safety Precautions for
Module Installation and Removal” section on page 3-2 and the “Preventing Electrostatic Discharge
Damage” section on page 3-2.
Make sure you have on hand the tools required for the installation. (See the “Tools Required for
Module Installation” section on page 3-3.)
Determine which chassis slot to install the module in. (See the “Determining Module Location”
section on page 3-3.)
Consider cabling for the console and uplink ports. (See Appendix B, “Cable and Connector
Specifications.)

Table of Contents

Related product manuals