Page 8 WS1 & 1.25 Man u al
OEM General In struc tions
The control valve offers multiple procedures that allow the valve to be modi ed to suit the needs of the installation. These
pro ce dures are:
OEM Softener Setup
OEM Filter Setup
Installer Displays & Settings
User Displays & Settings
Diagnostics
Valve History
These procedures can be accessed in any order. Details on each of the procedures are provided on the following pages.
At the discretion of the manufacturer, the  eld technician can access all settings. To “lock out” access to diagnostic and valve
history displays and modi cations to settings except hardness, day override, time of regeneration and time of day by anyone
but the manufacturer, press , NEXT, , and SET CLOCK in sequence after settings are made. To “unlock”, so other
displays can be viewed and changes can be made, press , NEXT, , and SET CLOCK in sequence.
When in operation normal user displays such as time of day, gallons remaining or days remaining before regeneration are
shown. When stepping through a procedure, if no buttons are pressed within  ve minutes the display returns to a normal user
display. Any changes made prior to the  ve minute time out are incorporated.
To quickly exit OEM Softener Setup, OEM Filter Setup, Installer Display Settings, Diagnostics or Valve History press SET
CLOCK. Any changes made prior to the exit are incorporated.
When desired all information in Diagnostics may be reset to zero when the valve is moved to a new location. To reset to zero,
press NEXT and simultaneously to go to the Service/OEM 1 screen, and release. Press and simultaneously to reset
diagnostic values to zero. Screen will return to User Display.
Sometimes it is desirable to have the valve initiate and complete two regenerations within 24 hours and then return to
the preset regeneration procedure. It is possible to do a double regeneration if the control valve is set to “NORMAL or
“NORMAL + on 0” in Step 9S or Step 7F. To do a double regeneration:
1. Press REGEN once. REGEN TODAY will  ash on the display.
2. Press and hold REGEN for three seconds until the valve regeneration initiates.
Once the valve has completed the immediate regeneration, the valve will regenerate one more time at the preset regeneration
time.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Clack Valve WS1.25 and is the answer not in the manual?

Clack Valve WS1.25 Specifications

General IconGeneral
BrandClack Valve
ModelWS1.25
CategoryControl Unit
LanguageEnglish

Related product manuals