EasyManua.ls Logo

Clack Valve WS1 CD Matrix - User Manual

Default Icon
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
WS1 & WS1 CD Matrix
1” & 1.25” Control Valve
with Fully Adjustable Cycles
Operation and Instruction Manual
Series
Question and Answer IconNeed help?

Do you have a question about the Clack Valve WS1 CD Matrix and is the answer not in the manual?

Clack Valve WS1 CD Matrix Specifications

General IconGeneral
BrandClack Valve
ModelWS1 CD Matrix
CategoryControl Unit
LanguageEnglish

Summary

Introduction to Control Valves

Control Valve Function and Cycles of Operation

Regeneration Cycles Softening

Details the sequence of regeneration cycles for softening applications.

Regeneration Cycles Filtering

Details the sequence of regeneration cycles for filtering applications.

OEM General Instructions

OEM Setup Procedures Overview

Outlines various setup procedures available for valve configuration.

OEM Cycle Sequence Configuration

Setting Cycle Order and Parameters

Details how to set the sequence of regeneration cycles like Backwash, Brine, Rinse, Fill.

OEM Softener System Setup

Configuring Softening Cycles

Details how to set times and parameters for softener operation cycles.

OEM Filter System Setup

Configuring Filter Cycles

Details how to set times and parameters for filter operation cycles.

Installer Display Settings

Setting System Parameters

Covers setting hardness, day override, and regeneration times.

User Display Settings

General Operation Displays

Explains the various displays shown during normal system operation.

Regeneration Mode and Time Setting

Details regeneration status displays and how to set the time of day.

System Diagnostics

System Status Monitoring

Provides access to view days since regeneration, volume treated, and flow rates.

Valve History Access

Accessing Operational Data

Displays software version, total days, regenerations, and gallons used.

Installation Procedures

Refill and Drain Line Fittings

Instructions for installing refill flow controls and drain line fittings.

Drain Line Flow Control Selection

Guidance on selecting and installing drain line flow control fittings.

Service Instructions

Drive Assembly Servicing

Steps for removing and reinstalling the valve's drive assembly.

Drive Cap Assembly and Pistons

Instructions for accessing and replacing drive cap, main, and regenerant pistons.

Injector and Water Meter Maintenance

Procedures for servicing injector and water meter components.

Component Drawings and Part Numbers

Valve Body, Drive, and Piston Assemblies

Exploded views and part numbers for valve body, drive, pistons, and related parts.

Fittings, Meter, and Ancillary Components

Exploded views and part numbers for injectors, drain lines, meter, bypass, and wrench.

Troubleshooting Procedures

Common Problems and Solutions

Lists common issues, their causes, and recommended solutions.

WS1 & WS1 CD Matrix Control Valve Programming Manual

Standard Features for the CD Model

Lists the standard features and capabilities of the CD control valve model.

OEM Configuration Setup

Setting Valve Type and Meter Size

Guides on selecting valve type and meter size during initial setup.

Alternator Valve Operation

Instructions for configuring the control valve to operate as an alternator.

No Hard Water Bypass Operation

Configuration steps for enabling no hard water bypass functionality.

Separate Source Operation

Configuration steps for operating the valve with a separate water source.

System Controller Operation

Steps to link the control valve to the Clack System Controller.

Auxiliary Drive Output (MAV)

Setting up auxiliary drive output for MAV operation (TIME or SEP SOURCE).

OEM Softener System Setup

Configuring Softening Cycles

Details how to set times and parameters for softener operation cycles.

Setting Grains Capacity and Volume Control

Configuring system capacity and regeneration trigger based on volume.

Relay Operation Setup

Setting up operation for Relay 1 based on time, volume, or hold.

Relay 2 Operation and Service Alarms

Configuring Relay 2 and setting up scheduled service alarms.

OEM Filter System Setup

Configuring Filter Cycles

Details how to set times and parameters for filter operation cycles.

Setting Volume Capacity and Regeneration Time

Configuring volume capacity and regeneration trigger for filters.

Installer Display Settings

Display Configuration

Setting hardness, days between regen, and regeneration time displays.

User Display Settings

General Operation Displays

Explains the various displays shown during normal system operation.

Regeneration Mode and Time Setting

Details regeneration status displays and how to set the time of day.

Error Messages

MAV Drive Error Handling

Explains error codes related to MAV drives and how to clear them.

Diagnostics

MAV Drive History

Displays drive time histories for active MAV drives.

Valve History

Error Log and Operational Data

Shows error log and total operational data like days and gallons since startup.

Limited Warranty

Clack Corporation Warranty Terms

Outlines the five-year limited warranty for softener and filter control valves.

Related product manuals