Do you have a question about the Clack Valve WS1 CD Matrix and is the answer not in the manual?
| Brand | Clack Valve |
|---|---|
| Model | WS1 CD Matrix |
| Category | Control Unit |
| Language | English |
Details the sequence of regeneration cycles for softening applications.
Details the sequence of regeneration cycles for filtering applications.
Outlines various setup procedures available for valve configuration.
Details how to set the sequence of regeneration cycles like Backwash, Brine, Rinse, Fill.
Details how to set times and parameters for softener operation cycles.
Details how to set times and parameters for filter operation cycles.
Covers setting hardness, day override, and regeneration times.
Explains the various displays shown during normal system operation.
Details regeneration status displays and how to set the time of day.
Provides access to view days since regeneration, volume treated, and flow rates.
Displays software version, total days, regenerations, and gallons used.
Instructions for installing refill flow controls and drain line fittings.
Guidance on selecting and installing drain line flow control fittings.
Steps for removing and reinstalling the valve's drive assembly.
Instructions for accessing and replacing drive cap, main, and regenerant pistons.
Procedures for servicing injector and water meter components.
Exploded views and part numbers for valve body, drive, pistons, and related parts.
Exploded views and part numbers for injectors, drain lines, meter, bypass, and wrench.
Lists common issues, their causes, and recommended solutions.
Lists the standard features and capabilities of the CD control valve model.
Guides on selecting valve type and meter size during initial setup.
Instructions for configuring the control valve to operate as an alternator.
Configuration steps for enabling no hard water bypass functionality.
Configuration steps for operating the valve with a separate water source.
Steps to link the control valve to the Clack System Controller.
Setting up auxiliary drive output for MAV operation (TIME or SEP SOURCE).
Details how to set times and parameters for softener operation cycles.
Configuring system capacity and regeneration trigger based on volume.
Setting up operation for Relay 1 based on time, volume, or hold.
Configuring Relay 2 and setting up scheduled service alarms.
Details how to set times and parameters for filter operation cycles.
Configuring volume capacity and regeneration trigger for filters.
Setting hardness, days between regen, and regeneration time displays.
Explains the various displays shown during normal system operation.
Details regeneration status displays and how to set the time of day.
Explains error codes related to MAV drives and how to clear them.
Displays drive time histories for active MAV drives.
Shows error log and total operational data like days and gallons since startup.
Outlines the five-year limited warranty for softener and filter control valves.