BOILER BOOK CFC-E ENGINEERING DATA
26
Condensation
The CFC-E uses one of several condensate removal options, depending on the application:
(1) Condensate direct to drain - The condensate is piped directly to a drain through the piping and
water trap supplied during installation (see Figure 17).
• Piping is to be a minimum of 3/4” NPT.
• Maximum discharge pipe height from floor to be 9”.
• Condensate water trap (5”) required.
(2) Neutralization Capsule - A compact, corrosion resistant capsule is piped to the condensate drain
downstream of the water trap. Capsule is filled with a replaceable neutralizing agent.
The neutralization media will require periodic replacement, to be determined by pH analysis of
condensate. If condensate is too acidic (pH is below acceptable value) the neutralization media
should be replaced.
Capsule is limited to individual boilers 1000 MBH and smaller.
Figure 18. Neutralization Capsule
Figure 17. Condensate Piped Direct to Drain
TO
DRAIN
FROM
BOILER