EasyManuals Logo

CleaverBrooks CFC-E Series User Manual

CleaverBrooks CFC-E Series
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
BOILER BOOK CFC-E ENGINEERING DATA
29
Gas Fuel Connections
The local Gas Company should be consulted for the requirements for installation and inspection of
gas supply piping. Installation of gas supply piping and venting must be in accordance with all
applicable engineering guidelines and regulatory codes. All connections made to the boiler must be
arranged so that all components are accessible for inspection, cleaning, and maintenance.
A drip leg should be installed in the supply line before the connection to the boiler. The drip leg
should be at least as large as the gas piping connection on the boiler. See Figure 23 and Figure 24
for piping suggestions.
Figure 21. Condensate Piping for Multiple Boilers
Figure 22. Tank Detail, Multiple Boilers
Total boiler capacity
per condensate tank
should not exceed
8,000,000 BTU/hr

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CleaverBrooks CFC-E Series and is the answer not in the manual?

CleaverBrooks CFC-E Series Specifications

General IconGeneral
BrandCleaverBrooks
ModelCFC-E Series
CategoryBoiler
LanguageEnglish

Related product manuals