EasyManuals Logo

CLIVET Box-SL 2 Series User Manual

CLIVET Box-SL 2 Series
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #94 background imageLoading...
Page #94 background image
Page 94
3. Drainage Test
a. Ensure the drainpipe flow smoothly. New buildings
should perform this test before finishing the ceiling.
b. Remove the test cover. Add 2000ml of water to the tank
through the attached tube.
c. Turn on the main power switch and run the air
conditioner in COOL mode.
d. Listen to the sound of the drain pump to see if it makes
any unusual noises.
e. Check to see that the water is discharged. It may
take up to one minute before the unit begins to drain
depending on the drainpipe.
f. Make sure that there are no leaks in any of the piping.
g. Stop the air conditioner. Turn off the main power switch
and reinstall the test cover.
Installation

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CLIVET Box-SL 2 Series and is the answer not in the manual?

CLIVET Box-SL 2 Series Specifications

General IconGeneral
BrandCLIVET
ModelBox-SL 2 Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals