EasyManuals Logo

CLIVET CKN-XHE2i 7.1 User Manual

CLIVET CKN-XHE2i 7.1
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
M06K40A18-00 CKN-XHE2i 7.1-14.2 4
9 Maintenance
9.1 General description
Maintenance must be done by authorized centres or by qualied personnel.
The maintenance allows to:
maintain the unit eciency
increase the life span of the equipment
assemble information and data to understand the state of the unit eciency and avoid possible damages
Before checking, please verify the following:
the electrical power supply line should be isolated at the beginning
the unit isolator is open, locked and equipped with the suitable warning
make sure no tension is present
After turning o the power, wait at least 5 minutes before accessing to the electrical panel or any other electrical component.
Before accessing check with a multimeter that there are no residual stresses.
9.2 Inspections frequency
Perform an inspection every 6 months minimum.
The frequency, however, depends on the use.
In the event of frequent use it is recommended to plan inspections at shorter intervals:
frequent use (continuous or very intermittent use, near the operating limits, etc)
critical use (service necessary)
intervention frequency (months) 1 6 12
1 presence corrosion X
2 panel xing X
3 fan xing X
4 coil cleaning X
5 bowl cleaning + sanitisation X
6 outow test X
7 air lters cleaning / inspection X
8 check of the xing and the insulation of the power lead X
9 check of the earthing cable X
10 electric panel cleaning X
11 capacity contactor status X
12 termina closing, cable insulation integrity X
13 voltage and phase unbalancing (no load and on-load) X
14 absorptions of the single electrical loads X
15 test of the compressor crankcase heaters X
16 Checking for leaks *
17 survey of the refrigerant circuit operating parameters X
18 safety valve *
19 protective device test: pressure switches, thermostats, ow switches etc.. X
20 control system test: setpoint, climatic compensations, capacity stepping, water / air ow-rate variations X
21 control device test: alarm signalling, thermometers, probes, pressure gauges etc.. X
* Refer to the local regulations; and ensure correct adherance. Companies and technicians that eect interventions of installation, maintenance/re-
pairs, leak control and recovery must be CERTIFIED as expected by the local regulations. The leak control must be eected with annual renewal.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CLIVET CKN-XHE2i 7.1 and is the answer not in the manual?

CLIVET CKN-XHE2i 7.1 Specifications

General IconGeneral
BrandCLIVET
ModelCKN-XHE2i 7.1
CategoryHeat Pump
LanguageEnglish

Related product manuals