22 CKN-XHE2i 7.1-14.2 M06K40A18-00
7.8 Voltages
Check that the air and water temperatures are within in the operating limits.
Start-up the unit.
With unit operating in stable conditions, check:
•
Voltage
•
Total absorption of the unit
•
Absorption of the single electric loads
7.9 Remote controls
Check that the remote controls (ON-OFF etc) are connected and, if necessary, enabled with the respective parameters as indicated in the
“electrical connections” section.
Check that probes and optional components are connected and enabled with the respective parameters (“electrical connections” section and
following pages).
7.10 Air ow management
Standard mode
The delivery air ow stays constant as the thermal load varies.
The ventilation remains active even when the setpoint is fullled.
Constant air ow rate
Option
The delivery air ow rate stays constant during variations in the thermal load and head losses of the unit and system.
The ventilation remains active even when the setpoint is fullled.
Variable airow
Option
The air ow supply varies depending on the heat load, up to a minimum value compatible with the distribution system and the chosen air
diusion.
The ventilation remains active even when the setpoint is fullled.
7.11 Air ow setting
Standard mode
The real unit ow is according to the aeraulic system features.
Before checking, make sure that the system has been completed in all its parts (shunts, dampers, grilles, diusers etc.).
Check the doors and windows of the serviced room are closed.
The unit must be calibrated while full recirculation has been running for at least 30 minutes.
The unit is in full recirculation during the rst 60 minutes of operation.
Set the fan’s percentage of operation:
FanSpeedOutMand