EasyManua.ls Logo

CODEL Tunnel Tech 500 Series - Page 35

Default Icon
43 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CODEL
Operation and Maintenance Manual
Issue : A Rev. : 3 Date : 13/11/2018 Ref. : 100351
P a g e | 27
Remove the 6x nuts from the four corners of the E-Cell, along with the washers. Ensure that these are kept
safe.
Figure 12: E-Cell PCB Removal
Slowly remove the E-Cell from the Unit.
Insert the new E-Cell in to the unit, observing the cell orientation and replace the nuts and washers.
Re fit the ribbon cable, and re bolt the enclosure lid
NOTE: Failure to replace cells will invalidate the warranty and performance of the analysers after this
time cannot be guaranteed.

Related product manuals