EasyManua.ls Logo

Colombo Twin Master - Machine Preparation; Leveling and Coupling to the Tractor

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
Instruction Manual - Twin Master
3
4
5 - Machine preparation
5.1 - Leveling and coupling to the tractor
a) On a rm and at place, turn the crank (1) of the stand
jack (2) in a such way that the Combine be leveled
(parallel) in relation to the soil.
b) Put the tractor near the Gatherer. Draw-bar should
coincide with the coupling terminal of the header (3).
In case there is need, adjust the draw-bar according
to your tractor Instruction Manual.
c) Couple the tractor draw-bar with the coupling system
of the Combine and put the lock.
d) Release the stand jack using the crank, release the
pin and put it in transporting position (4).
2
1