Edition 03/2022 - ACE – Technical documentation - page 9
SACOME, CONFIDENTIAL Document, it is forbidden to duplicate or communicate this document without previous authorization.
5 TURN “ON” THE MACHINE
After having connected the water inlet pipe, the drain, and the supplying voltage cable.
1. Open the water supply tap.
Check on the manometer M2, that the network pressure is between 2 and 6 Bar.
2. Power on the machine using the on/off switch under the machine.
3. The machine Turn On, and for 3 seconds:
The 3 digits display shows the software version (example 0.09)
And the led button turn On.
4. If the display show “Eco”, press B2 Button to start the machine.
5. Otherwise, the machine starts to fill up the steam boiler.
The pump goes On and the filling valve is Opened.
The leds are Off and the display shows 90.0
6. For the 1st time you need to do the 1st installation process:
(Please see next chapter for the “1
st
installation” before continuing this
chapter)
7. When the machine has finished to fill up the boiler, it starts to heat up both boilers.
The led button came blinking.
The Display shows the setting temperature of the coffee boiler.