4. INSTALLATION
4.1. IN CASE OF A STANDBY OF THE MACHINE (STANDBY = 2 MONTHS):
➢ The first thing to do is to test your machine in a lab.
➢ If the machine stop ruming for a long time, you could have scale in some places.
➢ More precisely in small area like the spray nozzle.
4.2. PROTECTIONS
➢ It is necessary to place before the machine:
o A water shutoff valve.
o An electrical protection standard, suitable for voltage and power consumption.
4.3. WATER SUPPLY
➢ Recommended operating pressure from 0,15 MPa to 0,6 MPa
➢ Water connection pin 3/8"
➢ The water supply pipes must resist to 145 Psi / 1 MPa
4.4. DRAIN
➢ Without pressure.
➢ Spigot at the outlet of the machine and a pipe is supplied with the machine
➢ Ensure a connection that causes no risk of fluid return, and ensure good drainage:
▪ The drain pipe must be located lower than the machine.
▪ Do not create a bend in the exhaust tube.
4.5. SUPPLYING VOLTAGE
According to the model:
➢ 230V – 50/60Hz Monofase
➢ 400V – 50/60Hz Trifase