Commissioning procedure
1. Inspect the electrical installation before starting the dehumidifier and switch on the mains switch:
• 230V – Check the voltage between the terminals L1, N
• Is the ground cable connected, and of the correct specifications?
• Is any hygrostat (if fitted) correctly connected?
2. Check the connected duct system:
• Is the recommended damper installed in the regeneration air outlet duct?
• Is the optional damper installed in the Dry Air Outlet duct?
• Do the regeneration air outlet ducts drain away from the dehumidifier, to make sure that any
condensed water flows away?
• If the regeneration air outlet does not drain away from the dehumidifier, check whether there
is a 6mm-diameter hole drilled in the lowest part of the duct, so that any accumulated water
can drain away.
3. Suggested damper positions/air flow settings at commissioning:
• Dampers/settings should be set in the following positions.
o Damper at Dry Air Outlet: Fully open.
o Damper at Regeneration Air Outlet: Fully open.
4. Once the dehumidifier is operating, adjust the potentiometer (if installed) and air flows according to