Required Tools for Setup
Cradlepoint recommends that a professional install the R1900 in any environment. However, the following tools may be necessary for setup.
#0 Philips-head screwdriver (for SIM cover screws)
#2 Philips-head screwdriver (for mounting screws)
Mounting tools - Depending on the location of installation, additional mounting tools may be necessary. These tools may include, but are not limited to:
Screwdrivers
Drill and drill bits
Additional screws
Zip ties
Back to top
Setup
Refer to the following for general setup instructions.
STEP 1: Check box for contents.
Prior to having the R1900 router installed, open the box and ensure that all items are present. You should have received the following:
[1] R1900 series router
[1] 3-meter (2x2) Power and GPIO cable
[4] M4 screws, nuts, and washers
[1] Mounting template
[1] Quick Start Reference sheet
[1] Safety, Warranty, and Regulatory guide
Accessories
To optimize the R1900 series router for Wireless WAN or with failover configuration, you will need at least one activated 4FF-sized SIM card, with an active
cellular data plan.
Additional accessories to enhance your router capabilities include, but are not limited to:
OBDII cable
RX30 Series managed accessory
Antennas
Refer to the Cradlepoint Antenna (https://cradlepoint.com/products/antennas/) webpage for assistance in locating a Cradlepoint Approved vendor.
STEP 2: Remove the SIM door.
Unscrew and remove the SIM cover from the router.
STEP 3: Insert an activated 4FF-sized SIM into the router.
Insert an activated 4FF SIM card into the SIM1 slot (contacts down, notch in). The SIM card will click into place.
Optionally, insert an active 4FF SIM into the SIM2 slot with the same orientation.