6
UNPACKING
The machine is properly packaged in a
crate for safe transportation. When
unpacking, carefully inspect the crate and
ensure that nothing has been damaged
during transit.
While doing the inventory if you can not find
any part, check if the part is already
installed on the machine.
The CX110 is a very heavy machine. Use a
forklift truck or other mechanical devices
when transporting the machine.
SETUP
When setting up your machine, you will
want to find an ideal spot where your cold
saw will most likely be positioned most of
the time.
Consider your complete work environment
before placing your machine in the ideal
spot.
Figure-1 CX110 dimensions
MOUNTING
The CX110 cabinet stand comes with four
mounting holes that allow you to mount the
machine to the shop floor.
Lag shield anchors with lag bolts and studs
are two popular methods for anchoring an
object to a concrete floor.
To mount the machine:
Once the stand is completely assembled,
position it in the desired location.
Mark the floor through the four holes on the
stand and move the stand away.
Drill holes on the floor and install the
mounting hardware into the floor using the
method that best fits your specific
application.
Place the stand over mounting hardware
and secure it.