EasyManua.ls Logo

CSZ MicroClimate Series - Maintenance and Troubleshooting; Inspection Schedule; Preventive Maintenance Schedule

CSZ MicroClimate Series
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE WITH Q&A
Page 5-1
INSPECTION SCHEDULE
In the day-to-day operation of this equipment, you will become aware of certain
levels of noise, vibration, temperature, and pressure. If you encounter any
signi• cant changes in these levels, investigate them immediately.
A inspection program should be developed for this equipment. To assist in your
development of this program, Cincinnati Sub-Zero has prepared a list of routine
inspections. While this list is not all inclusive, it will serve as a good base on
which to build your own custom program. The establishment of such a program
will add signi• cantly to the life of the equipment and will reduce unscheduled
down time on the equipment.
PREVENTIVE MAINTENANCE SCHEDULE
Please reference the
Installation section for
the proper procedures
for re moval and re-
installing of the lid while
conducting the preventive
maintenance schedule.
WARNING
!
INSPECT DAILY MONTHLY YEARLY
1. Interior & Exterior Cleaning X
2. R-404A Charge (If Applicable) X
3. R-508B Stand-By Pressure (If Applicable) X
4. Humidity Demineralizer Filter (Optional Equipment) X
5. Air Cooled Condenser (If Applicable) X
6. Electrical Panel X
7. Tubing Abrasion X
8. Humidity Sensor (Optional Equipment) X
9. Reservoir (Optional Equipment) X
10. Chamber Controller Calibration/Veri• cation X
DAILY
1. Interior and Exterior Cleaning
a. Wipe or vacuum out all debris.
b. Clean interior surfaces with a damp cloth, mild detergent, or stainless-steel
cleaner. Avoid cleaners that are abrasive or leave a residue. DO NOT use
steel wool.
c. Clean the chamber exterior and door gaskets with a damp cloth or a mild
detergent. If a detergent is used, test a small area to make sure it does not
damage the • nish.
MONTHLY
2. R-404A Charge (If Applicable)
Check the sightglass for bubbles every 7 to 14 days. If bubbles are present, the
unit is low on refrigerant. Call a quali• ed service technician to add refrigerant.
If any of the fol l owing
scheduled inspections require
maintenance, contact a
quali• ed service technician or
Cincinnati Sub-Zero's Service
department.
NOTE
Only qualified maintenance
personnel should be permitted
to perform any maintenance
procedures.
WARNING
!

Table of Contents