11
Stage 2
GRP edge trims
B230/B260/B300 - Raised Edge Trim
Asinglebattenisxedlevelwiththetopedgeofthedeck.ApplytheCureItTrimAdhesiveina
continuous strip along the batten, then rub the trim into place and nail through the top of the trim
into the decking. Do not nail through the front of the trim. If a ladder is likely to be leant against a
B type trim for regular access to the roof, the trim will need to be reinforced to avoid deformation.
The trim can either be doubled up by slotting a section of extra trim within the section where the
ladder will be used or it can be reinforced with an extra layer of Cure it laminate and then tissue to
maintainasmoothnish.Alternately,awoodenbattencanbeshapedandttedintotheridgeof
the trim to ensure that it remains rigid.
TRIM DETAILS:B230:Thesmallestsizeofraisededgetrimttedtotheedgesoftheroofto
containanddirecttheowofwater.B260:Thestandardsizeraisededgetrim.B300:Largerraised
edge trim for use on warm roofs.
C100/C100MT/C100L/C100LMT/C150/C150MT/C150L- Simulated Lead Flashing
TheCtrimisusuallyttedintoabedjointofthebrickworkora35/50mm(dependingonthe
trimtype)deepchasecutoutwithananglegrinderttedwithamortarchasedisc.Applythe
Cure It Trim Adhesive in a continuous strip to the back of the C trim. Fit the trim into the slot
andpressrmlybacktothewalltooverlaptheDtrim.Applyaleadsealantalongthelength
of the trim into the slot to seal the trim in. Do not topcoat.
TRIMDETAILS:C100:Standardsimulatedleadashingwith100mmverticalfaceand35mm
wall penetration. C100MT: As C100 with self securing moisture trap. C100L (Long leg): As
C100 with 50mm wall penetration. C100LMT (Long leg with Moisture Trap): As C100 with
50mmwallpenetrationandselfsecuringmoisturetrap.C150:Simulatedleadashingwith
150mm vertical face and 35mm wall penetration. C150MT (Moisture Trap): As C150 with an
integral, self-securing moisture trap. C150L (Long leg): As C150 with 50mm wall penetration.
Cross-section showing 35mm chase
cut into brickwork with angle grinder.
TheC100MTisttedwithCureItTrimAdhesiveappliedtothe
back of the trim and is sealed into place with lead sealant.
Decking GRP Layer and bandage
Support batten
Brick
Brick
Fascia
B260
Trim adhesive
OSB 3 deck
GRP laminate
Slate batten
Joist
Bandage
Trim adhesive
Channel
Finish chase with lead sealant
C100MT
GRP Layer and bandage
Decking25mm Gap
D260
C100/C100MT/C100L/C100LMT/C150/C150L/C150MT/ Application diagrams
B230/260/300 Application diagrams
Bond with trim adhesive