26
28: Place both 8-rung frames;
29: Place locking pins between the
frames themselves;
30: Move the two Mobile Guards frames
to the upper rung;
31: Place 2 diagonals
32: Place the platform with hatch (on the 5
th
rung from the top), Slide both blow-
away protections under the rung.
29
30
31
32