Proposed Install Checklist – final checkout
• Before-You-Leave Checklist
- Preliminary list, but should be appended with installer feedback
- Simple “rules of thumb” that can prevent call-backs
P
=Passed
F
=Failed
U
=Unable to
Check
N/A
=Not
Applicable
Item # Installation Checklist Results
1 Have all thermostats reported in the last 15min
2
Do the RSSI statistics from the Node Status page show good links for all nodes?
RSSI greater than 3 for last 24HR, current RSSI greater than 3 for all hops
3 Validate thermostat count for Repeaters and Husbs. Do any exceed 15?
4 Validate hop count. Make sure no more than 6 repeaters are needed for any WPT
5 Have the all the WPTs been calibrated?
Are all WPTs showing battery life of OK?
6
Plot or scan tables for pressure, setpoint and ambient values for each WPT installed.
Do the values make sense?
DA --> Ambient above setpoint, pressure should be
above
the calibration pressure
RA --> Ambient above setpoint, pressure should be
the calibration pressure
7 Have all repeaters reported in the last 15min
8 Is the last digit of each repeater ID unique?
9 Have all the necessary updates been made to the job site map?
10 Have all WPTs been noted on the map?
11 Have all RWALs been noted on map?
12 Are all Network IDs unique across multiple GBCs?
13 Are the repeater locations listed in the server descript enough?
14 Has the customer been properly trained?
15 Is there follow-up work needed?