EasyManuals Logo

D-Link DGS-1216T User Manual

D-Link DGS-1216T
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
10
Leave at least 10cm of space at the front and rear of the hub for
ventilation.
Install the Switch on a sturdy, level surface that can support its weight,
or in an EIA standard-size equipment rack. For information on rack
installation, see the next section, Rack Mounting.
When installing the Switch on a level surface, attach the rubber feet to
the bottom of each device. The rubber feet cushion the hub and
protect the hub case from scratching.
Figure 1. Attach the adhesive rubber pads to the bottom
Rack Mounting
The switch can be mounted in an EIA standard-size, 19-inch rack,
which can be placed in a wiring closet with other equipment. Attach
the mounting brackets at the switch’s front panel (one on each side),
and secure them with the provided screws.
Figure 2. Combine the Switch with the provided screws

Other manuals for D-Link DGS-1216T

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the D-Link DGS-1216T and is the answer not in the manual?

D-Link DGS-1216T Specifications

General IconGeneral
BrandD-Link
ModelDGS-1216T
CategorySwitch
LanguageEnglish

Related product manuals