EasyManua.ls Logo

D-Link DGS-3130 Series - Page 34

D-Link DGS-3130 Series
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DGS-3130 Series Layer 3 Stackable Managed Switch Hardware Installation Guide
34
Figure 3-5 Insert Tie Wrap into the Switch
2. Plug the AC power cord into the power socket of the Switch.
Figure 3-6 Connect the power cord to the Switch
3. Slide the retainer through the tie wrap until the end of the cord.
Figure 3-7 Slide the Retainer through the Tie Wrap
4. Circle the tie of the retainer around the power cord and into the locker of the retainer.

Table of Contents

Other manuals for D-Link DGS-3130 Series

Related product manuals