EasyManua.ls Logo

Dahua SD6C230U-HNI - Installation Steps

Dahua SD6C230U-HNI
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
The diameter of pole-mounted structure shall conform to the installation size of hose clamp.
It is equipped with 5-inch clamp by default (fit for the column of φ80-130mm). It is used
together with pole-mounted bracket, the diameter can be adjusted, and the adjustment
range is the clamp specification (7 types of dimension for users to select): φ59-82mm, φ84-
108mm, φ80-130mm, φ130-152mm, φ155-178mm, φ180-203mm and φ194-216mm. It can
select according to the users requirements, special dimension can be customized as well.
The pole-mounted structure shall sustain at least 8X weight of the speed dome.
6.2.2 Installation Steps
Step 1
Install hose clamp and pole-mounted bracket, pull the cable through pole-mounted accessory,
use hose clamp to fix the pole-mounted accessory on the pole, and then cover glass cement on
the cable exit hole to make it sealed, please refer to Figure 6-3 for the installation effect.
Figure 6-3
Note
Please check if the clamp is installed properly after installation, make sure it is firmly fastened
otherwise it may cause clamp fracture if it is installed improperly.
Step 2
Install speed dome, which is shown in Figure 6-4. Please refer to 2.5 Speed Dome Installation
for more details about installation mode.

Table of Contents

Related product manuals