CAUTION
▪ Incomplete flaring may cause refrigerant gas leakage.
▪ Do NOT re-use flares. Use new flares to prevent refrigerant gas leakage.
▪ Use flare nuts that are included with the unit. Using different flare nuts may
cause refrigerant gas leakage.
WARNING
▪ ONLY use R410A as refrigerant. Other substances may cause explosions and
accidents.
▪ R410A contains fluorinated greenhouse gases. Its global warming potential (GWP)
value is 2087.5. Do NOT vent these gases into the atmosphere.
▪ When charging refrigerant, ALWAYS use protective gloves and safety glasses.
DANGER: RISK OF BURNING/SCALDING
In case of high leaving water setpoints for space heating (either a high fixed setpoint
or a high weather-dependent setpoint at low ambient temperatures), the heat
exchanger of the boiler can be heated up to temperatures higher than 60°C.
In case of a tapping demand, it is possible that a small volume of water tapping
(<0.3l) has a temperature higher than 60°C.
Electrical installation (see
"9Electrical installation"[
4
110]
)
DANGER: RISK OF ELECTROCUTION
WARNING
▪ If the power supply has a missing or wrong N-phase, equipment might break
down.
▪ Establish proper earthing. Do NOT earth the unit to a utility pipe, surge absorber,
or telephone earth. Incomplete earthing may cause electrical shock.
▪ Install the required fuses or circuit breakers.
▪ Secure the electrical wiring with cable ties so that the cables do NOT come in
contact with sharp edges or piping, particularly on the high-pressure side.
▪ Do NOT use taped wires, stranded conductor wires, extension cords, or
connections from a star system. They can cause overheating, electrical shock or
fire.
▪ Do NOT install a phase advancing capacitor, because this unit is equipped with an
inverter. A phase advancing capacitor will reduce performance and may cause
accidents.
WARNING
▪ All wiring MUST be performed by an authorised electrician and MUST comply
with the applicable legislation.
▪ Make electrical connections to the fixed wiring.
▪ All components procured on-site and all electrical construction MUST comply
with the applicable legislation.
WARNING
ALWAYS use multicore cable for power supply cables.