Loading...
7 | Unit installation
Installer reference guide
81
EVLQ05+08CA + EHYHBH05A + EHYHBH/X08A + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1G – 2022.09
≤1000 mm
≤2000 mm
≤1000 mm
≤250 mm
≤250 mm
≤250 mm
≤250 mm
≥3° (50 mm/m)
≤1000 mm
≤1000 mm
≤500 mm
a
b
a Second clamp after the second elbow
b First clamp after the second elbow
7.7 Condensate pipe work
INFORMATION
The condensate discharge system MUST be made of plastic, no other materials may
be used. The discharge duct MUST have a minimum gradient of 5~20 mm/m.
Condensate discharge via the gutter is NOT allowed due to risk of frost and the
possible damage to the materials.