9 | Electrical installation
Installer reference guide
125
EPRA14~18DAV3+W1 + ETVH16SU18+23EA6V
Daikin Altherma 3 H HT F
4P644738-1 – 2021.02
a Installation of EKRP1HBAA is required.
b Prewiring between X2M/7+9 and Q1L (=thermal protector backup heater). Do NOT
change.
3 Fix the cable with cable ties to the cable tie mountings.
9.3.8 To connect the changeover to external heat source
Wires: 2×0.75mm²
Maximum load: 0.3A, 250VAC
Minimum load: 20mA, 5VDC
[9.C] Bivalent
1 Open the following (see "7.2.5To open the indoor unit"[470]):
1 Top panel
2 User interface panel
3 Upper switch box cover
2 Connect the changeover to external heat source cable to the appropriate
terminals as shown in the illustration below.