EasyManua.ls Logo

Daikin Enfinity CCH User Manual

Daikin Enfinity CCH
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation and Maintenance Manual IM 1049-9
Group: WSHP
Part Number: 910258820
Date: December 2018
Daikin Ennity™ Horizontal Water Source Heat Pumps
R-410A Refrigerant
Model CCH, CCW Unit Sizes 007 – 070

Questions and Answers:

Daikin Enfinity CCH Specifications

General IconGeneral
BrandDaikin
ModelEnfinity CCH
CategoryHeat Pump
LanguageEnglish

Summary

Model Nomenclature and Specifications

Model Nomenclature Code Breakdown

Explains the coding system for unit models and their specifications.

Installation Preparation and Procedures

Pre-Installation Checks and Preparation

Crucial steps before installation, including voltage, phase, capacity verification.

Electrical, Piping, and System Setup

Unit Controls and Operation

Initial Unit Start-Up Procedures

Sequence for setting thermostat, checking airflow, and verifying temperatures for initial operation.

MicroTech III Controller Features and Operation

Details the features and functions of the MicroTech III unit controller.

Communication Module Integration

Installation and operation info for LONWORKS and BACnet communication modules.

Unit Start-Up Sequence Steps

Step-by-step guide for initiating unit operation after installation.

Maintenance and Troubleshooting

MicroTech III Controller LED Fault Diagnosis

Explains LED fault codes for the MicroTech III controller and their causes.

Refrigeration Circuit Troubleshooting Guide

A chart correlating symptoms like pressure and temperature differentials with potential causes.

Unit Operation Troubleshooting Flowchart

A visual guide to diagnosing unit operational issues based on symptoms.

Performance, Forms, and Information

Equipment Check, Test, and Start Form

A checklist for verifying system components and operational parameters during start-up.

Unit Equipment Data Collection

Identifies key points for measuring flow rate, temperature, and pressure for data collection.

Commercial Check, Test and Start Worksheet

A table for recording various equipment measurements during installation and start-up.

Related product manuals